Today: 7 January 2025
13 April 2023
2 mins read

Rashid Rover ready to touch down on April 25

The Rashid Rover is currently orbiting the Moon at an altitude of about 100 km at the perilune (periapsis) and about 2,300 km at the apolune (apoapsis)….reports Asian Lite News

The Mohammed Bin Rashid Space Centre (MBRSC) announced that the Rashid Rover, onboard the HAKUTO-R Mission 1 Lunar Lander, is scheduled to land on the Moon on 25th April 2023 at 8:40 PM (UAE time).

The landing date is subject to change depending on operational conditions. The Rashid Rover is currently orbiting the Moon at an altitude of about 100 km at the perilune (periapsis) and about 2,300 km at the apolune (apoapsis). The points in the orbit that is closest to the centre of the moon are called perilune, and the farthest is known as apolune.

At around 7:40 PM on 25th April, the lander carrying Rashid Rover will perform multiple orbital control manoeuvrers to reach a 100 km circular orbit around the Moon before initiating the landing sequence. During the landing sequence, the lander will perform a braking burn, firing its main propulsion system to decelerate from orbit. Utilising a series of pre-set commands, the lander will adjust its altitude and reduce velocity to make a soft landing on the confirmed site of Atlas Crater in the Mare Frigoris.

The ELM team will complete close to a total 370 minutes of communication with the world’s most compact rover before landing, along with 12 mission rehearsals for surface operations. The mission rehearsal is crucial for the engineering team to be prepared and ready with their programmes for execution post the lunar landing and also enable the different teams on the subsystems to sync their operational work.

The next stage of navigation for HAKUTO-R Mission 1 lunar lander that holds the Rashid Rover includes the completion of all planned lunar orbital control manoeuvrers before the landing sequence as well as confirm that the lander is ready to start the landing sequence. In case of any changes in operational conditions, three alternative landing sites, with the next landing opportunities set for 26th April, 1st and 3rd May, have also been scheduled.

The Emirates Lunar Mission is funded by the ICT Fund of the Telecommunications and Digital Government Regulatory Authority (TDRA) which aims to support research and development in the ICT sector in the UAE.

ALSO READ: Sheikh Mohamed bin Zayed, Sisi review regional developments

Previous Story

Al Jaber seeks ‘fundamental reform’ of IFIs, MDBs

Next Story

US Lawmaker calls for India to join ‘team America’

Latest from -Top News

Iran, Saudi Pledge Stronger Ties

Rahimi on Sunday expressed satisfaction with the resumption of friendly relations between the two countries since 2023…reports Asian Lite News Iranian Justice Minister Amin-Hossein Rahimi held a meeting with Saudi Ambassador to

UN Chief Calls Out Israel on Syria

Guterres underscored that Israel and Syria must uphold the terms of the 1974 Disengagement of Forces Agreement, which remains fully in force…reports Asian Lite News UN Secretary-General Antonio Guterres has urged Israel

28 Indians detained in Bahrain repatriated 

The Embassy further said that the fishermen were initially sentenced to six months, but their term was reduced to three months. ..reports Asian Lite News The Indian Embassy in Bahrain on Wednesday announced
Go toTop

Don't Miss

UAE presents national report on nuclear safety

The purpose of the report is to describe the legislative,

Israel condemns deadly Houthi attack in UAE

Israel has condemned Monday’s deadly Houthi attack in the United