Today: 20 June 2025
2 December 2021
1 min read

Emirates announces flypast over Sevens Stadium

The flypast is being conducted to celebrate the UAE’s 50th Jubilee during the Emirates Dubai 7s…reports Asian Lite News

Emirates will be performing a low level flypast over the Sevens Stadium on 3 December between 1540-1545hrs DXB time with its special 50th anniversary livery. The flypast is being conducted to celebrate the UAE’s 50th Jubilee during the Emirates Dubai 7s.

Media and the general public will be able to take photos and videos of the flypast during that time along the aircraft’s flight path, but are also reminded to comply with GCAA safety guidelines to ensure no disruption to the aerial display. 

ALSO READ: Emirates launches daily flights to Tel Aviv from December



Previous Story

Fujairah Ruler visits tomb of Sheikh Zayed

Next Story

Modi may visit UAE in Jan

Latest from Arab News

US weighs joining fight with Israel

Europe’s push for diplomacy is in sharp contrast to messages from Washington, with President Trump openly weighing bombing Iran  Iran’s foreign minister will meet in Geneva with counterparts from Germany, France and

Kremlin warns US against Iran strike

Putin revealed that Moscow had proposed several compromise frameworks to all involved parties — including the US, Israel, and Iran Washington would be making a serious mistake by launching an attack on

UAE tops global FDI charts

UNCTAD ranks UAE 10th globally for FDI inflows in 2024, with record AED 167.6 billion secured The United Arab Emirates has emerged as one of the world’s top ten destinations for foreign

Arab nations warn of wider war

According to GCC, the Israeli attacks not only undermine Iranian sovereignty but also pose grave threats to regional peace and security. 21 Arab and Islamic countries have urged a return to negotiations,
Go toTop

Don't Miss

ADNOC, Reliance sign pact for chemical project

The agreement capitalises on the growing demand for these critical

Al Maktoum Solar Park Breaks Two Guinness World Records

The records were achieved in the 950MW 4th phase of